Tell us the job
Call or send the form with what you're after and roughly where it goes. You get a fast response.
Garden paths, side paths and front footpaths, poured level and finished to suit your home. Fast response and a free quote across Hervey Bay and the Fraser Coast.

Hervey Bay Concreting pours concrete paths across Hervey Bay and the Fraser Coast surrounds, roughly 45km out: garden paths, side paths and front footpaths. You choose plain, coloured or exposed aggregate. Every path goes down on a compacted base with steel and control joints, and every job starts with a free quote.
Side paths to the bins and clothesline, and links between the house, the garden and a new shed slab. A concrete path stays level and even underfoot, so a wheelbarrow or a pram rolls easily and there are no loose pavers to trip on.

The path from your driveway or front gate to the door is the first thing visitors walk on. A broom or exposed aggregate finish gives grip on wet days, and clean edges let the path frame the garden. It can match a new concrete driveway in the same finish.
A path out to the kerb crosses council land, so it needs approval first. Fraser Coast Regional Council's vehicle crossover fact sheet explains when a permit is needed and what the property owner looks after. Planning a pool surround as well? See exposed aggregate for the most popular non-slip finish.
Tap the options to compare them side by side, or sort by what matters most to you.
Broom finish. The low-cost, low-fuss pick.

Lots of patterns. Joints need care.

Cheap to start. Spreads and needs topping up.

Stone on top for grip and looks.
Colour right through the mix.

Casual look. Not for barrows or bins.
More dots = better for you on that row. A general guide only; your site, soil and budget decide.
Typical builds for homes around Hervey Bay. Your quote sets the exact spec for your site and soil. For the technical background, the industry body Cement Concrete & Aggregates Australia publishes a free Guide to Concrete Construction.
| Thickness | Around 75 to 100mm for garden, side and front paths |
|---|---|
| Base | Compacted, so the path doesn't sink or crack over soft spots |
| Steel | Reinforcing mesh on bar chairs, so it sits inside the concrete |
| Anything a car crosses | Built like a driveway, thicker and reinforced for the load |
| Falls | A gentle slope away from the house so rain runs off, not against your walls |
| Control joints | Cut at regular spacing so shrinkage cracks follow a straight line |
Call or send the form with what you're after and roughly where it goes. You get a fast response.
We measure up, check levels and drainage, and give you an itemised quote, so you know exactly what you're paying for.
Dig out, compact the base, set the forms and falls, and lay the steel.
Pour, finish to the look you picked, cut the control joints and clean up.
Concrete paths are quoted anywhere in Hervey Bay and out to roughly 45km, from Pialba to Maryborough. If your suburb isn't below, call and check.
Most garden and side paths are poured around 75 to 100mm thick on a compacted base, with reinforcing mesh. Anything a car or trailer will cross needs to be built like a driveway instead. Your quote sets the exact spec for your site.
It depends on the length and width, access, how much digging and base work the site needs, and the finish you pick. Plain concrete costs the least and exposed aggregate costs more. You get a free, itemised quote before any work starts, so you can compare it fairly.
For low upkeep, usually yes. A concrete path is one solid surface, so there are no joints for weeds or ants and nothing to sink, lift or spread. Pavers give you more patterns, and gravel costs less to start but needs raking and topping up.
Yes. A single side path, a strip to the clothesline or a small landing at the back door is worth a call. No job is too small to quote.
A path inside your own property usually doesn't. Work on the council footpath or verge out the front, including a new driveway crossover, needs Fraser Coast Regional Council approval first (or Transport and Main Roads on a state road). Mention it when you ask for a quote.
Light foot traffic is usually fine after a day or two. Wheelie bins, barrows and anything heavy should wait longer, as concrete keeps gaining strength for about 28 days.
Tell us what you're planning and where. We'll get back to you fast with a free, itemised quote.
07 4120 7772